Monday, August 17, 2009

Build-o-Mania 2



Despite some rain days and a small hitch with an inspection, the building project moves steadily onward. Here are a few pictures of the current status. The foundation has been backfilled and a new parking area has been graded and graveled. We moved some big rocks to mark the edge of the parking pad. On the exterior, we now have siding on two of the three walls. We'll stain it to match the logs on the exisiting cabin. On the interior, the wall studs are all up and most of the insulation is in. Wiring and plumbing are almost complete -- and the new jacuzzi bath has been installed. Susie can't wait to start tiling the floors and walls.